Jammu & Kashmir • पासून प्रभावी 2025-04-01
KPDCL
Kashmir Power Distribution Corporation Ltd. — KPDCL साठी सध्याचे स्लॅब दर, निश्चित शुल्क आणि FAC — 2025-04-01 पासून प्रभावी.
Calculate Your Electricity Bill
Pick your state, DISCOM and enter units — we do the math exactly the way your DISCOM does.
Connection Type
Input Mode
Tip: Your bill shows this as "units consumed" or "kWh".
Usually 1–5 kW for homes, 5–20 kW for shops.
Notes for KPDCL:
- Serves Kashmir Valley; large winter heating load. Smart-metering rollout under RDSS.
KPDCL · घरगुती · स्लॅब-निहाय दर
पासून प्रभावी 2025-04-01.
| Slab (units / month) | Energy rate (₹/unit) |
|---|---|
| 1 – 100 | ₹1.65 |
| 101 – 200 | ₹2.65 |
| 201 – 400 | ₹3.55 |
| 401 – 800 | ₹4.90 |
| Above 800 | ₹5.80 |
- Fixed charges
- Slab-based
- FAC / FPPCA
- —
- Electricity duty
- 0%
- Telescopic
- Yes
KPDCL · व्यावसायिक
| Slab (units / month) | Energy rate (₹/unit) |
|---|---|
| 1 – 100 | ₹4.50 |
| 101 – 400 | ₹5.75 |
| Above 400 | ₹6.70 |
- Fixed charges
- ₹55/kW/mo
- FAC / FPPCA
- —
- Electricity duty
- 0%
- Telescopic
- Yes
KPDCL · औद्योगिक
| Slab (units / month) | Energy rate (₹/unit) |
|---|---|
| Above 0 | ₹5.25 |
- Fixed charges
- ₹65/kW/mo
- FAC / FPPCA
- —
- Electricity duty
- 0%
- Telescopic
- No
KPDCL
100 युनिट्स
₹205
₹2.05/युनिट्स
200 युनिट्स
₹470
₹2.35/युनिट्स
300 युनिट्स
₹825
₹2.75/युनिट्स
500 युनिट्स
₹1,670
₹3.34/युनिट्स
750 युनिट्स
₹2,895
₹3.86/युनिट्स
1000 युनिट्स
₹4,300
₹4.30/युनिट्स